账号:
密码:
    QQ登录
建筑电气
当前位置:首页 >> 建筑电气杂志 >> 2017年第11期(总第240期)

中英医疗建筑电气设计差异简析

来源于: 发表时间:2017-12-05 16:12 编辑:fzy

李家驹(中国中元国际工程有限公司医疗建筑设计研究二院, 北京市 100089)

Brief Analysis of Electrical Design Differences between Chinese and British Medical Buildings
LI Jiaju(Second Institute of Healthcare Architecture Design & Research Institute,China
IPPR International Engineering Co., Ltd.,Beijing 100089,China)
 
    Abstract:Through the investigation of the British general hospitals and combined with an example of one international hospital design and analysis of electrical specifications of some British medical buildings,lateral comparison of domestic electrical design specifications of medical buildings is conducted in terms of power supply reliability and so on. Also,the author talks about his opinions by combining current domestic general electrical practices for medical buildings.
    Key words:medical building;electrical design;health building note(HBN);health technical memorandum(HTM);power supply reliability;“N + 1”principle;power supply time;load rate
 
    摘 要:通过对英国多所综合性医院的考察,结合某国际化医院设计实例及对部分英国医疗建筑电气规范翻译的分析,在供电可靠性等方面横向对比国内医疗建筑电气设计规范,并结合目前国内医疗建筑电气通用做法谈谈笔者的见解。
    关键词:医疗建筑;电气设计;健康建筑注释系列(HBN);卫生技术备忘录系列(HTM);供电可靠性;“N + 1”原则;供电时间;负载率
     中图分类号:TU852         文献标识码:A
     doi:10. 3969 / j. issn. 1003 - 8493. 2017. 11. 003

相关信息:

  • 推荐文章

  • 热门文章