“总价加单价”计价模式下EPC项目电气设计探讨

来源于: 发表时间:2023-06-04 18:06 编辑:fzy

 

总价加单价计价模式下EPC项目电气设计探讨

凌(中国建筑西南设计研究院有限公司,成都市 610042

Discussion on Electrical Design of EPC Projects under the Pricing Model of

“Total Price + Unit Price”

HUANG Ling(China Southwest Architectural Design and Research

Institute Corp. Ltd,Chengdu 610042China

 

 

AbstractAccording to the construction characteristics of EPC projects,the electrical design characteristics of traditional contracting mode and EPC mode in the design phase(scheme,preliminary design and construction drawing design)are analyzed and studied,and the principles and strategies that need to be considered and controlled in the electrical design throughout the process of EPC project for total contract price under the pricing mode of“total price + unit price”are discussed in view of the special characteristics of electrical design for EPC project.

Key words“total price + unit price”;pricing mode;EPC;traditional mode;electrical design;specificity;quota design;technical strategy

 

摘 要:根据工程总承包(EPC)项目的建设特点,对传统承包模式和EPC模式项目在设计阶段(方案、初设、施工图设计)的电气设计特点进行分析、研究,针对EPC项目电气设计的特殊性,重点探讨了在总价 + 单价计价模式下EPC项目合同总价部分内容在全过程设计中电气设计需要重点考虑和把控的原则和策略内容。

关键词:总价 + 单价;计价模式;EPC;传统模式;电气设计;特殊性;限额设计;技术策略