金茂三亚度假大酒店一期、二期电气设计比较

来源于: 发表时间:2010-01-11 10:01 编辑:系统管理员

 李 楠(上海建筑设计研究院有限公司,上海市 200041)

 
Comparison of the First Stage with Second Stage Electrical Design of Sanya Jinmao Resort & Spa.
 
Li Nan(Shanghai Institute of Architectural Design & Research Co.,Ltd.,Shanghai 200041,China)
 
Abstract The electrical designs of buildings of the two five-star hotels in the first stage and second stage of Sanya Jinmao Resort & Spa. are compared,including the following content:① determination of the location of the substations;②arrangement of the electrical energy management system;③ distribution box system in the standard rooms of the hotel;④ the causes for increasing important load incoming lines in the guest rooms in the second stage;⑤ predominance of the guest rooms management system and the problems in practical applications,etc.
Key words Five -star hotel Substation Electrical energy management system Guest rooms management system
 
摘 要 比较了金茂三亚度假大酒店一、二期两个五星级酒店建筑的电气设计,包括以下几方面内容:① 变电所位置的确定;② 电能管理系统的设置;③ 酒店标准客房的配电箱系统;④ 二期在客房中增加重要负荷进线的原因;⑤ 客房管理系统的优势及其在实际应用中的问题等。
关键词 五星级酒店 变电所 电能管理系统 客房管理系统 