“超限”高层建筑电气设计中几个问题的探讨

来源于: 发表时间:2010-01-13 14:01 编辑:系统管理员

陈众励(上海建筑设计研究院有限公司,上海市 200041)

Discussion about a Few Issues in the Electrical Design of “Transf inite”Tall Buildings
Chen Zhongli(Shanghai Institute of Architectural Design & Research Co.,Ltd.,Shanghai 200041,China)
 
Abstract In this paper,several key issues in the electrical design of the so - called“transfinite”tall buildings with the building altitude of 250 m and above are discussed,including the form of the main wiring,the elevator operating mode under disaster,the control strategy of fire control linkage,the continuous power supply duration of emergency lighting and counter - terrorism measures.
Key words “Transfinite”tall buildings Transformer’s parallel operation Fire-extinguishing medium Linkage control Evacuation under disaster Emergency lighting Harmonic treatment Counter -terrorism measures
 
摘 要 对建筑高度为250 m及以上的“超限”高层建筑电气设计中的几个关键问题,包括主接线形式、灾时电梯运行模式、消防联动控制策略、应急照明连续供电时间、反恐措施等进行了探讨。
关键词 “超限”高层建筑 变压器并列运行 灭火介质 联动控制 灾时人员疏散 应急照明 谐波治理 反恐措施