账号:
密码:
    QQ登录
建筑电气
当前位置:首页 >> 建筑电气杂志 >> 2009年第08期(总第141期)

两种接地布线方式的仿真试验分析*

来源于: 发表时间:2010-01-13 16:01 编辑:系统管理员

覃彬全(重庆市防雷中心,重庆市 401147)

李良福(重庆市气象局,重庆市 401147)
袁 涛(重庆大学电气工程学院,重庆市 400044)
Simulation Experiment Analysis for Two Grounding Wiring Modes *
Qin Binquan(Chongqing Lightning Protection Center, Chongqing 401147,China)
Li Liangfu(Chongqing Meteorological Bureau, Chongqing 401147,China)
Yuan Tao(College of Electrical Engineering, Chongqing University, Chongqing 400044,China)
Abstract By means of ATP-EMTP electro-magnetic transient program, a comparative analysis of numerical simulation experiment for the electronic equipments to use the grounding wiring modes that shares a same network and common busbar with a same network but not common busbar is carried out . It is concluded that,it is safer for electronic equipments to use the grounding mode with same network but not the common busbar than to use the grounding mode with same network and common busbar.
Key words Grounding wiring mode Physical model Electromagnetic transient model Analysis
 
摘 要 通过ATP - EMTP电磁暂态程序,对电子设备采用共网共母线和共网不共母线接地布线方式进行了数值仿真试验比较分析,得出电子设备采用共网不共母线接地散流方式比采用共网共母线散流方式更安全的结论。
关键词 接地布线方式 物理模型 电磁暂态模型 分析

 

相关信息:

  • 推荐文章

  • 热门文章