账号:
密码:
    QQ登录
建筑电气
当前位置:首页 >> 建筑电气杂志 >> 2010年第09期(总第154期)

汶川第二小学电气设计

来源于: 发表时间:2010-09-29 16:09 编辑:付泽艺

刘 卫(中国建筑西南设计研究院有限公司,成都市 610081)

Electrical Design of Wenchuan No. 2 Primary School
Liu Wei(China Southwest Architectural Design and Research Institute CORP. LTD,Chengdu 610081,China)
Abstract The electrical design of the reconstruction of Wenchuan No. 2 primary school is introduced;it is pointed out that the design personnel shall select a more reasonable electrical design scheme and take electrical technical measures supporting the structural seismic isolation design based on the specific conditions of the project,and closely coordinate with the main construction parties to improve the construction drawing design,and do a good job of later period service.
Key words Wenchuan No. 2 primary school Electrical design Electrical seismic isolation measure Later period service
        摘 要 介绍汶川第二小学重建的电气设计,指出设计人员应根据项目的具体情况,选择较为合理的电气设计方案,制定配合结构隔震设计的电气技术措施,并与建设主体各方密切配合,完善施工图设计,搞好后期服务。
       关键词 汶川二小 电气设计 电气隔震措施 后期服务

相关信息:

  • 推荐文章

  • 热门文章