对一级负荷供电要求的探讨及供电方案的分析

来源于: 发表时间:2010-09-29 16:09 编辑:付泽艺

张家富(中国建筑西南设计研究院有限公司,成都市 610081)

Discussion on Power Supply Requirements of First Grade Loads and Analysis
on Power Supply Scheme
Zhang Jiafu(China Southwest Architectural Design and Research Institute CORP. LTD,Chengdu 610081,China)
         Abstract The article discusses the requirements on the power supply of first grade loads in the standards and based on the analysis of terminal switching mode of double supply loop and head end switching mode of double supply single loop,compares the power supply reliability and construction investment and introduces a solution to the selection of reasonable power supply mode of first grade loads.
Key words First grade load Power supply requirement Double supply Duplicated supply Terminal switching of double supply loop Head end switching of double supply single circuit
        摘 要 探讨规范对一级负荷供电要求的规定;分析双电源回路末端切换供电方式与双电源首端切换单回路供电方式,比较其供电可靠性及建设投资,提出合理选择一级负荷供电方式的策略。
       关键词 一级负荷 供电要求 两个电源 双重电源 双电源回路末端切换 双电源首端切换单回路供电