Optimization Design of Power Supply and Distribution System for Centaurus Project in Pakistan
Wang Sujun(China Southwest Architectural Design and Research Institute CORP. LTD,Chengdu 610081,China)
Abstract This article describes the optimization design of 11 kV distribution system,self - provided diesel generator power supply system and these two types of systems for Centaurus Project in Pakistan. Based on domestic and international codes and standards,and in combination with the project characteristics such as the load property and power capacity,the original foreign power supply scheme is optimized,meeting the requirements of relevant standards and significantly reducing the investment costs of the constructor’s side.
Key words Optimization design of power supply and distribution system Working electric source Stand - by electric source Emergency supply Substation settings
摘 要 介绍巴基斯坦人马座工程 11 kV 配电系统、自备柴油发电机供电系统,及两系统的优化设计。依据国内外规范和标准,结合项目负荷性质、用电容量等工程特点,优化原国外设计方的供电方案,在满足相关标准的基础上,为建造方大大节约了投资。
关键词 供配电系统优化设计 工作电源 备用电源 应急电源 变配电所设置