魏志刚(中国建筑西北设计研究院有限公司,西安市 710018)
Feasibility Analysis of Combined Cooling,Heating and Power(CCHP)as Emergency Power Supply in a Project
WEI Zhigang(China Northwest Architecture Design and Research Institute Co. Ltd.,Xi’an 710018,China)
Abstract:The feasibility of CCHP as emergency power supply is discussed by introducing the operation mode of CCHP system according to the implementation requirements of a project scheme,and analyzing and comparing the reliability of power supply between gas-fired internal combustion generating set and diesel generating set.
Key words:CCHP;diesel generating set;determining power by heat;determining heat by power;emergency power supply;grid-connected;black-start;power dispatching
摘 要:通过介绍冷热电三联供系统运行方式,结合某工程方案实施要求,分析比较燃气内燃发电机组与柴油发电机组的供电可靠性,探讨冷热电三联供作为应急电源的可行性。
关键词:冷热电三联供;柴油发电机组;以热定电;以电定热;应急电源;并网;黑启动;用电调度
中图分类号:TU852 文献标识码:A
doi:10. 3969 / j. issn. 1003 - 8493. 2019. 05. 004