账号:
密码:
    QQ登录
建筑电气
当前位置:首页 >> 建筑电气杂志 >> 2019年第10期(总第263期)

以转换动作时间选择转换开关

来源于: 发表时间:2019-11-06 14:11 编辑:fzy

    兵(陕西铭拓机电技术有限公司,西安市 100070

Selection of Transfer Switch Pursuant to Switching Time

LI BingShanxi Mingtuo Mechanical & Electrical Technology Co.Ltd.Xian 100070China

 

    AbstractThe purpose of double power supply system and ATSE is to make sure that the load is not affected by power interruption. The operating transfer time is not only an important parameters of ATSEbut also a criteria of supply continuity of double power supply system. Three types of transfer switches including Automatic Transfer Switch EquipmentATSE),Static Transfer SwitchSTSand Transient Transfer SwitchTTSare differentiated in terms of operating transfer time.

    Key wordsATSESTSTTSoperating transfer timeload application categorysupply continuityload power off time

 

  摘 要:双电源供电系统的建立和自动转换开关的使用,目的是确保用电负载不因供电中断而影响工作。转换动作时间不单是自动转换开关的重要参数,也是双电源供电系统供电连续性的指标。本文从转换动作时间这一参数上区分3种形式的转换开关:自动转换开关(ATSE)、静态转换开关(STS)和瞬态转换开关(T T S)的不同和应用。

  关键词:自动转换开关(ATSE);静态转换开关(STS);瞬态转换开关(T T S);转换动作时间;负载应用类别;供电连续性;负载断电时间

     中图分类号:TM564                文献标识码:A

      doi10. 3969 / j. issn. 1003 - 8493. 2019. 10. 005

相关信息:

  • 推荐文章

  • 热门文章