侯 剑(中国建筑西南设计研究院有限公司,成都市 610042)
航站楼电气设计方案的几个痛点问题探讨(侯剑)
Discussion on Several Pain Points in Electrical Design Schemes of Terminals
HOU Jian(China Southwest Architectural Design and Research Institute
Corp. Ltd.,Chengdu 610042,China)
Abstract:In this paper,taking the setting scheme of three 10 kV power distribution systems and switch stations,different methods of cable laying in and out of distribution room,comparison and selection of design scheme of emergency lighting and evacuation indication system of a terminal as an example,the idea of optimal scheme selection dominated by the party most affected so as to take into account all parties is put forward in terms of different focuses and possible disagreement of construction headquarters,use departments,designers when choosing design schemes of a large‑scale terminal.
Key words:terminal;strong current design scheme;10 kV distribution system;setting of switch station;laying methods;emergency lighting and evacuation indication system;evacuation direction marker lights;visual continuity
摘 要:针对大型航站楼设计方案选择时,建设指挥部、使用部门、设计单位三方关注的侧重点不同、意见可能不一致的痛点问题,以某航站楼3个10 kV配电系统及开关站设置方案、航站楼配电房不同进出电缆敷设方式,以及航站楼应急照明和疏散指示系统设计方案的比较和选择为例,提出由受影响最大的一方来主导方案的选择,以期提供兼顾各方的最优方案选择思路。
关键词:航站楼;强电设计方案;10 kV配电系统;开关站设置;敷设方式;应急照明及疏散指示系统;疏散方向标志灯;视觉连续