烈性传染病住院楼电气设计
韩 瀛 乌聪敏(天津大学建筑设计规划研究总院有限公司,天津市 300072)
Electrical Design for Fulminating Infectious Disease Inpatient Building
HAN Ying WU Congmin(Tianjin University Research Institute of Architectural Design
and Urban Planning Co.,Ltd.,Tianjin 300072,China)
Abstract:The design features,load classification,load calculation as well as the power transformation and distribution system of the fulminating infectious disease inpatient building are introduced,the key design points in electrical discipline are summarized,
and the challenges in the process of construction and reconstruction are analyzed.
Key words:fulminating infectious disease;emergency infectious disease inpatient building;negative pressure ward;three areas and two channels;location of diesel generator room;load classification;power configuration; power quality
摘 要:介绍烈性传染病住院楼的设计特点、负荷分级、负荷计算和变配电系统,总结其电气专业的设计要点,分析新建和改造过程中出现的难点问题。
关键词:烈性传染病;应急传染病住院楼;负压病房;三区两通道;柴油发电机房位置;负荷分级;电源配置;电能质量
中图分类号:TU852 文献标识码:A
doi:10.3969 / j. issn.1003 - 8493.2021.09.012