以原供电系统为扩建部分供电的可行性研究

来源于: 发表时间:2022-04-27 09:04 编辑:fzy

 

以原供电系统为扩建部分供电的可行性研究

吴华杰(科进顾问(亚洲)有限公司,香港特别行政区)

Feasibility Study on Power Supply with the Original Power

Supply System Feeding an Extension

Ng Hwa Kit Eric(WSP(Asia)Limited,Hong Kong Special Administrative RegionChina)

 

 

Abstract  A feasibility study is carried out for utilizing the original power supply system to feed the expansion of a landmark project in Northeast China. The Phase load is estimated. The power consumption of Phase project introduced from the power supply bureau and the actual power consumption of Phase project are analyzed. The power supply distance of utilizing the original power supply system to feed Phase project is analyzed. Finally,conclusions are drawn in this paper:the power supply transformation adopts the method of increasing the load factor of the original power supply facilitiesthe original power supply system is utilized to feed the expansion project,so as to reduce the initial installation cost of the expansion part.

Key wordspower supply transformation;load estimation;transformer installation capacity;load factor;initial installation cost;actual power consumption;high voltage incoming line;power supply distance

 

摘 要:对东北某地标性项目以原供电系统为扩建部分供电进行可行性研究:对3期负荷进行估算;分析从供电局引入1期的供电量及1期的实际用电量;研究采用原供电系统为3期供电的供电距离。最后得出结论:供电改造采用提高原供电设施负载率的方式,采用原供电系统为扩建部分供电,以降低扩建部分的初装成本。

关键词:供电改造;负荷估算;变压器安装容量;负载率;初装成本;实际用电量;高压进线;供电距离

中图分类号:TU852             文献标识码:A

doi10.3969 / j. issn.1003 8493.2022.04.008