后疫情时代隔离酒店电气设计

来源于: 发表时间:2022-09-15 17:09 编辑:fzy

 后疫情时代隔离酒店电气设计

王红梅(中建科工集团有限公司,广东省深圳市 518057

Electrical Design of Quarantine Hotels in the Post‑pandemic Era

WANG Hongmei(China Construction Science and Industry Corporation

Ltd.,Shenzhen 518057,Guangdong ProvinceChina)

 

 

AbstractIn this paper,through specific project case,the characteristics and design requirements of the new quarantine hotel project combined with the use functions during normal and epidemic times are analyzed,the main points of electrical design and the problems to be paid attention to are explained from the aspects of load classification,power supply and distribution system,lighting, lightning protection and grounding,etc.,and in combination with the requirements of epidemic prevention function,combination of use functions during normal and epidemic times,and rapid construction,the solutions are analyzed and proposed.

Key wordsquarantine hotel;electrical design;load classification;power supply and distribution system;combination of use functions during normal and epidemic times;rapid construction;modular design;pipeline separation

 

摘 要:通过具体项目案例,分析平疫结合的新建隔离酒店项目特点和设计要求,从负荷分级、供配电系统、照明、防雷接地等方面阐述电气设计要点和需注意的问题,并结合防疫功能、平疫结合、快速建造等要求,分析并提出解决措施。

关键词:隔离酒店;电气设计;负荷分级;供配电系统;平疫结合;快速建造;模块化设计;管线分离